Every project. One connected system.

Civil 360 brings budgets, site records, procurement, equipment, compliance and handover into one construction operating system, from a family home to a funded road.

Running infrastructure or a programme of projects? Request a demo

Northern Bypass, Lot 2 · Ch 0+000 to 6+200Demonstration data
ProgressMonth 9 of 18
55.0%Planned
47.3%Earned
0.86SPI
MoneyUGX bn
Budget8.42
Committed5.10
Actual4.20
Certified3.71
Paid, confirmed3.33
Waiting for you3
  • IPC 07 for QS reviewMeasured to 30 Sep · UGX 286.4m
  • Confirm goods receivedGRN-0088 · 240 t crushed stone
  • Site photos, Ch 2+350Culvert base · 6 photos
Project Doctor06:00

Possible completion-cost pressure on 4.02 Subbase

Forecast UGX 1.21bn against a budget of 1.12bn. Sources: PO-0142, IPC 07, daily logs.

Recommended: QS review before IPC 08

Construction runs on scattered records.

Spreadsheets, WhatsApp groups, paper diaries, supplier documents and a separate accounting system. Each holds part of the truth, and none of them agree.

  • Limited visibilityOwners and directors see progress late and second-hand.
  • Unclear accountabilityNobody can show who approved what, and when.
  • Uncontrolled costOverruns surface when invoices arrive, not when orders are placed.
  • Weak procurement visibilityOrders, deliveries and imports tracked by phone.
  • Incomplete site evidencePhotos in personal phones, diaries written from memory.
  • Poor handoverThe asset owner inherits a box of files.

One record, from the first budget to maintenance.

Each stage hands real records to the next. Follow one BOQ item along the project.

Plan

Project setup, BOQ, budgets and schedules.

See how plan works
Record passed on

BOQ item 4.02 Subbase, 18,600 m³, baseline UGX 1.12bn

Demonstration data

Built layer by layer, recorded metre by metre.

On a road, progress is a position as well as a percentage. Move along the alignment: the section shows which layers are approved at that chainage, and the linear chart shows every layer at once.

Northern Bypass, Lot 2 · progress by chainage

Each layer is recorded on site, inspected through an RFI and drawn here from the approved records.

Demonstration data
Typical cross-section: 7.0 m carriageway, 1.5 m shoulders, 2.5% camber 7.0 m carriageway 1.5 m 1.5 m 2.5% ↘↙ 2.5% CL
Vertical scale exaggerated ×3. Layer thicknesses are a demonstration design; your project uses its own specification.
ChainageCh 2+350
  • Asphalt wearing courseAC 14, 50 mm…
  • BaseCrushed stone (CRR), 150 mm…
  • SubbaseNatural gravel G30, 200 mm…
  • Improved subgradeSelected fill G15, 300 mm…
  • EarthworksFill to formation level…

Approved layer   Hold point recorded by the relocations team. Documents filed by chainage are found within ±50 m of the point you choose.

Three levels of the same system.

Start where your project is. A home, a building and a road use the same records, with more control at each tier.

Tier 1

Build

Homeowners and small works

“I can follow the money, purchases, deliveries and progress of my build without becoming a construction software expert.”

  • Simple project budget by stage
  • Purchases and expense records
  • Suppliers and deliveries
  • Progress with photo evidence
  • Approvals between owner and engineer
  • Loans and repayments
Tier 2

Manage

Contractors, developers and professional project teams

“I can control costs, procurement, site work, equipment, reporting and approvals from one platform.”

  • BOQ import, review and variations
  • Budget, commitment and cost control
  • Valuations and IPCs
  • Programme, look-ahead and earned value
  • Site diaries, inspections and RFIs
  • Departments, roles and report chains
Tier 3

Enterprise

Infrastructure contractors, large developers and institutions

“I can run complex infrastructure work, commercial controls, compliance and equipment across projects.”

  • Everything in Manage
  • Chainage-based roads and bridges
  • Six-step IPC with retention and advances
  • Survey, setting-out and as-built checks
  • Relocations and grievance registers
  • Compliance vault and funder rules

See the work, not a feature list.

Each view below is built from the same project records your team enters.

Plant today · Lot 2

Demonstration data
Equipment hours today
MachineHours (operating · idle · down)UseCost to BOQ
EX-03Excavator 30 t · Ch 2+30073%UGX 1.85m
GR-01Motor grader · Ch 1+80065%UGX 1.42m
RL-02Vibratory roller · Ch 1+80054%UGX 0.96m
TP-07Tipper 20 m³ · Haul88%UGX 0.88m
TP-08Tipper 20 m³ · Haul42%UGX 0.88m
OperatingIdleDownUse = operating ÷ (operating + idle + down). Cost from approved logs, allocated to the BOQ activity worked.

Financial accountability you can trace.

Budget, committed, actual, certified and paid are different numbers. Civil 360 keeps them apart, with every approval recorded.

  • One double-entry ledger per project, append-only
  • Payments settled only when matched to the bank or mobile-money record
  • Role-based access enforced in the database
  • Every approval keeps who, when and what changed
How financial control works

One cost code, five different figures

Demonstration data

BOQ 4.02 Subbase, UGX millions. Step through what happens to it.

BudgetThe approved amount for the work. Not money spent.
1,120
CommittedPromised through approved orders and subcontracts. Still unpaid.
0
Actual costGoods or work received and invoiced. A cost, not yet a payment.
0
CertifiedMeasured and certified in a valuation or IPC.
0
Paid, confirmedMatched to the bank or mobile-money record. Only now is it settled.
0
Non-custodial by design

Civil 360 records, approves, tracks and reconciles construction money. The money itself stays with your bank, mobile-money provider or payment processor. Civil 360 is not a bank, escrow or wallet, and a receipt photo or SMS is evidence, not proof of payment.

Intelligence that shows its working.

The Civil 360 Assistant answers from your project records and the documents in your library, and cites them. Numbers come from the database, never from the AI.

  • 06:00 project briefThe project manager and heads get the day's three points before site opens.
  • Answers with sourcesAsk about a document or a record; the answer names where it came from.
  • Professional judgement stays humanNo AI approves a payment, certifies work or decides entitlement.

Start with one project.

Set up a home, a building or a road in minutes. Bring your team in by link when you are ready.